Facade installation on the ground floor up to level 02. In the last few weeks, the area of the diagrid facade made of aluminium and glass has reached the top level 58. This aluminium element facade now runs over 56 floors from level 03 up to and including level 58. On top of that, a roof superstructure will follow soon, which will resume the diagrid pattern, but in the form of a pure aluminium cladding. Now we were able to continue with the facade of the lowest floors, the ground floor and levels 01 and 02.