HOME | Current Projects | Newfoundland Tower London – Dismantling Construction Lift
Newfoundland Tower London – Dismantling Construction Lift
Dismantling Construction Lift
February 2020
The construction lift is dismantled and the facade gradually becomes completely visible. The construction lift set up for the transportation of all the construction and facade elements up to each individual floor, all the way up to the 60th floor, is now being dismantled piece by piece, and at the same time the insertion openings remaining there are now also being closed by the last facade elements. Simultaneously, the acceptance of the facade floor by floor continues and the interior work is already in full swing. An especially wonderful view is just emerging from another London facade project, about 1 km away as the crow flies on the opposite side of the Canary Wharf, in the form of the skyscraper One Park Drive.